From aging water mains to complex industrial pipelines, our projects highlight the versatility, efficiency, and environmental benefits of trenchless solutions—eliminating the need for disruptive excavations while ensuring long-lasting performance.

Fold-and-Form Lining:Rehabilitation of DN600 Coastal Wastewater Pressure Pipeline

During a routine inspection of the coastal wastewater pipeline in Zhuhai, a significant overflow of sewage was discovered.

Spiral Wound Lining: Repair of a DN1000 Pipeline Beneath the Bogotá Metro

Due to the project's unique location, the complexity of the construction increased, and our products were designed to ensure the successful repair of the pipeline while effectively addressing the challenges posed by the surrounding traffic environment.

Fold-and-Form: DN600 River-Crossing Sewer Rehabilitation in Zhejiang

The pipeline exhibited severe corrosion, misaligned joints, and multiple inverted bends exceeding 70 degrees - with one inspection chamber completely inaccessible beneath power conduits.

Jiulong River Trunk Sewer Collapse Rehabilitation Project

Leveraging advanced technology and efficient project management, the Anyue team successfully delivered the Jiulong River trunk sewer rehabilitation project, overcoming numerous technical obstacles.

Fold-and-Form Lining for DN400 Drinking Water Pipe

The total rehabilitation length was approximately 124 meters. Site surveys revealed six pipeline bends along the route, with the sharpest bend reaching an angle of 50°, significantly increasing the construction complexity.

UV CIPP: Rehabilitation of DN800 Gravity Sewer Pipeline

Anyue recently completed a challenging UV Cured-In-Place Pipe (CIPP) lining project involving two segments of DN800mm underground gravity sewer pipelines, measuring 161 meters and 158 meters respectively.

UV CIPP: Pipeline Rehabilitation Project for Sewage Pump Station

The project involved the establishment of a new sewage pump station with a capacity of 45,000 tons per day, along with the upgrade of an existing facility to enhance its capacity to 55,000 tons per day.

UV CIPP: DN1000 Sewage Pipeline Collapse Repair Project

The emergency repair project focused on the collapse of the DN1000 sewage pipeline upstream of the wastewater treatment plant.

Fold&Form: DN600 Trenchless Potable Water Pipeline Repair

This project focuses on the trenchless repair of the DN600 potable water pipeline along Shangxiadian Road in Fuzhou City. The pipeline, which extends 1,100 meters, has shown significant signs of corrosion and localized damage due to long-term service.

UV CIPP: DN1200 River Crossing Pipeline Rehabilitation

The DN1200 pipeline, severely damaged with significant water infiltration requiring urgent rehabilitation during extreme winter conditions (minimum temperature: -9°C).